CLIENT: Bury NHS Trust
LOCATION: Bury
PROJECT COST: Part of the £48m Reconfiguration Programme
DESCRIPTION: The new building is a modified Nucleus Template design and connects and extends the previous Phase 1 development.
The new structure is a 3-storey structure founded on reinforced concrete foundations and ground beams with a structural steel frame. The main Plant room stands above the second floor roof and is within the new roof space, it also links into the two existing Plant rooms.
RELATED DOCUMENT:
Fairfield_phase2B.pdf
|
|